Assumptions
Conditions and Assumptions
Compliance
- Design will comply with applicable CE requirements for industrial electronics.
- Wi‑Fi RF operation will comply with applicable regional wireless regulations (pre‑compliance scope).
- Final certification and authority approvals, if required, are outside the current project scope unless explicitly stated.
Unique Serial Code
- Each deployed edge controller and sensing unit will carry a unique serial number for identification.
- Serial numbers will be used for installation records, calibration mapping, maintenance tracking, and data correlation.
Site & Infrastructure Assumptions
- Adequate physical mounting locations are available for LiDAR sensors, cameras, and edge controllers near the track.
- Stable power availability is provided at the installation location.
- Line‑of‑sight or acceptable mounting geometry is feasible for accurate wagon profiling and speed detection.
- Necessary permissions for trackside installation will be arranged by the customer.
Manufacturing & Procurement
- Availability of LiDAR sensors, AI cameras, and industrial networking components is subject to supplier lead times.
- Any delays caused by global supply constraints may impact the project schedule.
- Component substitutions due to EOL or non‑availability will be proposed with equivalent or better specifications and will require customer approval.
Data & Accuracy Assumptions
- Wagon load estimation is based on relative 3D profiling and is not intended to replace certified weighbridge systems.
- Accuracy is dependent on correct installation, calibration, and environmental conditions.
- Extreme dust accumulation or physical obstructions may temporarily affect measurement accuracy.
Scope Changes
- Any request beyond the defined scope—such as additional analytics, third‑party system integrations, dashboard customization, or production‑scale rollouts—will be treated as a separate scope of work.
- Scope changes may impact commercial terms, timelines, and delivery milestones and will require formal written approval.